top of page
Your Tax Dollars at Work
Hughes Road ditch cleaning
Hughes Road ditch cleaning
Pitts Road plugged tile removal and ditch restoration
Pitts Road plugged tile removal and ditch restoration
Pitts Road plugged tile removal and ditch restoration
Pitts Road plugged tile removal and ditch restoration
Pitts Road plugged tile removal and ditch restoration
Pitts Road plugged tile removal and ditch restoration
Pitts Road plugged tile removal and ditch restoration
Pitts Road plugged tile removal and ditch restoration
Installing the new playground equipment
New swings and climbing wall
Installing the new playground equipment
New jungle climber
Ground level merry go round
Zip line for fun and games
Hughes Road Bridge Deck Replacement
Hughes Road Bridge Deck Replacement
New LED Sign
New LED Sign Added December of 2022 with funds from Pittsfield and Federal Covid Rescue Funds
Meeting Dates
Sign will post Trustee's Meeting Dates
Weather
Sign can provide up to date weather information in color!
New Metal Roof
New Metal Roof Installed on Town Hall December 2022 with Funds from Pittsfield Township, Federal Rescue Fund and Townships Insurance Grant.
New Metal Roof
New Metal Roof Installed on Town Hall December 2022 with Funds from Pittsfield Township, Federal Rescue Fund and Townships Insurance Grant.
2022 Ford F450 Heavy Duty Truck
Pittsfield Newest Snow Fighter, a 2022 Ford F450 Heavy Duty Truck Powered by a 7.3 Liter Gas Engine, 4 Wheel Drive, Super Cab! Truck is Equipped with a Stainless Steel Bed
Please stay at least 50' back
Please stay at least 50' back especially at intersections as they may be backing up!
Western 10' Commercial V Plow
Truck is equipped with a Western 10' Commercial V Plow
Town Hall Parking Lot Paved with Asphalt
May of 2021
Town Hall Parking Lot Paved with Asphalt To Prevent Tar From Tracking in on the Floor and Was Enlarged to Provide More Parking.
Town Hall Parking Lot Paved with Asphalt To Prevent Tar From Tracking in on the Floor and Was Enlarged to Provide More Parking.
Town Hall Parking Lot Paved with Asphalt
May of 2021
Town Hall Parking Lot Paved with Asphalt To Prevent Tar From Tracking in on the Floor and Was Enlarged to Provide More Parking.
Town Hall Parking Lot Paved with Asphalt To Prevent Tar From Tracking in on the Floor and Was Enlarged to Provide More Parking.
Cemetery Trees
Cemetery Trees Planted March of 2021 which replace the Pine Trees that had Pine Disease.
Service Building & Salt Bin
Pittsfield's New Service Building & Salt Bin, put into Service December 2017 & 2019 Respectively
bottom of page